<legend id="tlvte"></legend>
<span id="tlvte"><output id="tlvte"><nav id="tlvte"></nav></output></span>
<legend id="tlvte"><i id="tlvte"></i></legend>

<legend id="tlvte"><i id="tlvte"></i></legend>
Shenzhen Grande Electronic Linkedin Page
Shenzhen Grande Electronic Co., Ltd logo
E-mail us for a Quote:
sales88@greattong.com
Call us now:
+86-755-83261869

Industrial Fire Detection Device | Circuit Board Assembly | PCBA Manufacturing

2020-11-03

Supplier: Grande Electronics Layers: 8 Application: Industrial Fire Detection Device | Circuit Board Assembly | PCBA Manufacturing PCB:FR-4/1.6mm,1oz finished copper Surface Treatment: ENIG PCBA Lead time: 3-4 weeks Packing: Anti-static bag an

READ MORE

Multimedia Processing Equipment PCBA Manufacturing & Assembly - EMS Company

2020-11-03

Supplier: Grande Electronics Layers: 6 Application: Multimedia Processing Equipment PCBA Manufacturing & Assembly - EMS Company PCB:FR-4/1.6mm,1oz finished copper Surface Treatment: ENIG PCBA Lead time: 3-4 weeks Packing: Anti-static bag a

READ MORE

PCBA Programming

2020-11-03

In PCB Assembly process, in order to make the circuit board realize certain specific function, in addition to the hardware, the support of the software is also required. If there is software, it is necessary to add the process of "programming" i

READ MORE

Wireless Tracking All In One Product PCB Assembly- PCBA Manufacturer - Grande

2020-11-02

Supplier: Grande Electronics Layers: 6 Application: Wireless Tracking All In One Product PCB Assembly- PCBA Manufacturer - Grande PCB:FR-4/1.6mm,1oz finished copper Surface Treatment: ENIG PCBA Lead time: 3-4 weeks Packing: Anti-static bag and

READ MORE

Optical Transmission Series PCBA Card - Printed Circuit Board Assembly - Grande

2020-11-02

Supplier: Grande Electronics Layers: 4 Application: Optical Transmission Series PCBA Card - Printed Circuit Board Assembly - Grande PCB:FR-4/1.6mm,1oz finished copper Surface Treatment: ENIG PCBA Lead time: 3-4 weeks Packing: Anti-static bag a

READ MORE

Service/Storage Equipment Multi Layer PCBA - Contract Manfacturing - EMS China

2020-11-02

Supplier: Grande Electronics Layers: 6 Application: Service/Storage Equipment Multi Layer PCBA - Contract Manfacturing - EMS China PCB:FR-4/1.6mm,1oz finished copper Surface Treatment: ENIG PCBA Lead time: 3-4 weeks Packing: Anti-static bag an

READ MORE

OTN Transmission Equipment High-Speed PCB Assembly -Grande Electronics

2020-11-02

Supplier: Grande Electronics Layers: 4 Application:OTN Transmission Equipment High-Speed PCB Assembly -Grande Electronics PCB:FR-4/1.6mm,1oz finished copper Surface Treatment: ENIG PCBA Lead time: 3-4 weeks Packing: Anti-static bag and compar

READ MORE

PCBA - SMT Assembly Process Introduction

2020-11-02

With the development trend of miniaturization and thinning of electronic products, many circuit boards in electronic products now use SMT manufacturing technology ( surface mount technology), that is, all electronic components are soldered on the surface

READ MORE

Common Mistakes In PCB Layout

2020-10-30

Common Mistakes In PCB Layout 1. Random Placement Of Silkscreen 2. The Abuse Of The Graphics Layer 3. The Overlap Of Pads etc.

READ MORE

I/O Module PCBA Manufacturing - Prototype PCB Assembly - 58pcba.com

2020-10-30

Supplier: Grande Electronics Layers: 6 Application: I/O Module PCBA Manufacturing - Prototype PCB Assembly - 58pcba.com PCB:FR-4/1.6mm,1oz finished copper Surface Treatment: HASL PCBA Lead time: 3-4 weeks Packing: Anti-static bag and compartme

READ MORE
Home About Us Services Quality Pb-Free News Contact Us


Copyright ® 2017,Shenzhen Grande Electronic Co., Ltd. All Rights Reserved. 中文站 Sitemap

大香中文字幕伊人久热大